OEM commissioning support
An equipment OEM was struggling to keep up with FAT/SAT records and open-item closure before site handover during a busy delivery period. Our team supported FAT/SAT documentation, loop/I-O verification and commissioning within the OEM's standard.
- OEM support
- Commissioning
- NDA-based
Starting point
An equipment OEM needed additional commissioning and FAT/SAT documentation capacity for export machine deliveries without changing its established PLC/SCADA standard.
Problem
Peak delivery periods created gaps in structured FAT/SAT records, loop verification and commissioning open-item closure before site handover.
Work performed
We ran FAT/SAT checklists in line with the OEM's documentation standard, supported loop and I/O verification, tracked the open-item list and prepared handover notes. We acted as engineering support inside the OEM project — not as the end user's main contractor.
What was delivered
FAT/SAT checklists executed under OEM templates
Loop and I/O verification contribution
Commissioning open-item list and issue log
Software backup and version record
Handover and final commissioning report structure
Outcome
The OEM's site teams received traceable test records and a consistent as-built handover file.

Generic OT architecture reference diagram; does not contain real customer topology.
Areas of work
- FAT/SAT documentation under OEM templates
- Field commissioning support
- Loop / I/O verification contribution
- Commissioning open-item list and issue log
- Handover and as-built notes
- Software version records
Scope note
Work carried out under the OEM's project structure. Customer, site and OEM customer details are not shared.