FAT / SAT & commissioning
The hard part of commissioning is not getting the system to run. It is recording which signals were tested, which scenarios were accepted and which items are still open.
With FAT/SAT checklists, loop checks, open-item tracking and handover records, the maintenance team gets more than a signed certificate.
Where we step in
We build the test plan from the agreed I/O list, software version and acceptance criteria, run it on site and follow open items until they are closed. Site safety and operating authority stay with the plant owner and OEM, as defined in the project.
Typical outputs
Pre-commissioning review and readiness checklist
FAT test checklist and execution records
SAT test checklist and site test records
I/O and loop check contribution
Alarm, interlock, recipe and batch test records where in scope
Deviation tracking and commissioning open-item list with ownership
Software backup package and version record
Commissioning issue log
As-built and configuration notes
Operator / maintenance handover summary
Final commissioning report structure
Rollback and recovery notes where applicable
Scope note
This summary does not replace a project-specific FAT/SAT file. Test depth follows the contract and the OEM's quality requirements.
Full service index: Services
Share your commissioning plan and FAT/SAT template, and we will agree test depth and site support together.