FAT / SAT & commissioning

The hard part of commissioning is not getting the system to run. It is recording which signals were tested, which scenarios were accepted and which items are still open.

With FAT/SAT checklists, loop checks, open-item tracking and handover records, the maintenance team gets more than a signed certificate.

Where we step in

We build the test plan from the agreed I/O list, software version and acceptance criteria, run it on site and follow open items until they are closed. Site safety and operating authority stay with the plant owner and OEM, as defined in the project.

Typical outputs

Pre-commissioning review and readiness checklist

FAT test checklist and execution records

SAT test checklist and site test records

I/O and loop check contribution

Alarm, interlock, recipe and batch test records where in scope

Deviation tracking and commissioning open-item list with ownership

Software backup package and version record

Commissioning issue log

As-built and configuration notes

Operator / maintenance handover summary

Final commissioning report structure

Rollback and recovery notes where applicable

Scope note

This summary does not replace a project-specific FAT/SAT file. Test depth follows the contract and the OEM's quality requirements.

Full service index: Services

Share your commissioning plan and FAT/SAT template, and we will agree test depth and site support together.

Let's talk about your commissioning plan
  • About
  • Services
  • Machine builders & OEM
  • Capabilities
  • Cases
  • Partners
  • Insights
  • Contact

© 2026 Analog Control