Services
FAT / SAT & commissioning
Test and commissioning work structured for traceable handover — under OEM standards or partner project responsibility matrices.
Analog Control contributes FAT/SAT documentation, field commissioning support and issue tracking so operations and maintenance receive usable records, not only a signed certificate.
Commissioning discipline
Commissioning scope is bounded by agreed I/O lists, loop checks, software versions and acceptance criteria. Site safety and operational authority remain with the site owner and OEM lead as defined in the project.
FAT / SAT & commissioning deliverables
- Pre-commissioning review and readiness checklist
- FAT test checklist and execution records
- SAT test checklist and site test records
- I/O and loop check contribution
- Alarm, interlock, recipe and batch test records where in scope
- Deviation tracking and commissioning open-item list with ownership
- Software backup package and version record
- Commissioning issue log
- As-built and configuration notes
- Operator / maintenance handover summary
- Final commissioning report structure
- Rollback and recovery notes where applicable
Reference accuracy
Public summaries do not substitute for project-specific FAT/SAT binders. Deliverable depth is agreed per contract and OEM quality requirements.